Installation and construction of semi-concealed frame glass curtain walls

Jun 07, 2026|

The installation of semi-concealed frame glass curtain walls must strictly adhere to their structural characteristics, namely, one pair of sides is bonded with structural adhesive (structural glass assembly), and the other pair of sides is mechanically fixed using aluminum alloy inlay grooves. Depending on the glass assembly direction, it is mainly divided into two types: Vertically concealed but horizontally unconcealed, and horizontally concealed but vertically unconcealed. Installation involves factory processing and on-site assembly, placing specific requirements on the process and environment.

Vertical Concealed but Horizontally Unconcealed Glass Curtain Wall Installation: In this type, only the vertical bars are concealed behind the coated glass, while the horizontal bars and coated glass are inlaid in the inlay grooves of the aluminum alloy profiles, covered by aluminum alloy pressure plates. In actual fabrication and installation, there are two methods (A and B). Method A: The glass is glued to the glass frame with installation grooves on both vertical sides, and the vertical sides of the glass frame are fixed to the vertical bars of the aluminum alloy frame system using fixing plates; while the top and bottom horizontal sides of the glass are fixed in the inlay grooves of the aluminum alloy frame beams. The bonding of the glass to the vertical sides of the glass frame is completed in a dedicated workshop in the factory through adhesive injection, ensuring clean material surfaces and high-quality bonding. The glass frame is transported to the site for installation only after the structural adhesive has fully cured, ensuring bonding quality. Method B: The coated glass is first fixed into the mounting grooves of the top and bottom aluminum alloy profiles, forming a groove for adhesive joint between the glass and the vertical rod. Then, structural adhesive is filled into the groove on-site, forming a vertical structural adhesive glass assembly system. Because this method involves on-site adhesive injection, it is difficult to guarantee the cleanliness and dryness of the material surfaces and the cleanliness of the environment during injection. Furthermore, the structured adhesive often has to withstand wind loads before curing, affecting bonding strength. This method is generally limited to buildings with no installation gap between the building and the aluminum alloy frame system and should be avoided unless absolutely necessary. During on-site adhesive injection, various methods should be used to temporarily seal and protect the injection site, and the bonding surfaces of the aluminum and glass must be thoroughly cleaned. On-site adhesive injection should generally not be performed in windy, rainy, or freezing winter weather.

 

Horizontal Concealed, Vertical Unconcealed Glass Curtain Wall Installation: This system uses a structural glass assembly method horizontally, while vertically it uses aluminum alloy glass mounting grooves for fixation. The specific procedure involves bonding the glass to a glass frame with mounting grooves on both the top and bottom edges. The upper frame rests on a crossbeam of an aluminum alloy frame system, while the lower frame is fixed to the lower crossbeam with fixing plates. The vertical edges are fixed to the glass mounting grooves within the vertical bars using pressure plates, forming long strips of glass divided from top to bottom by the vertical bars and pressure plates. Since the horizontal edges are concealed while the vertical edges are not, on-site grouting is not possible and is not permitted.

 

General Installation Technical Requirements and Quality Control: The glass panels should be grouted and cured at the factory. Before grouting, the glass panel and aluminum frame should be cleaned using a "two-wipe" process. Grouting should be performed within one hour after cleaning. The ambient temperature for grouting should be between 15 and 30°C, and the relative humidity should be above 50%. After grouting, curing is required in a clean room with a temperature of 20°C and humidity above 50% (approximately 14-21 days for single-component grout and approximately 7-10 days for two-component grout). Panels must pass a sampling peel test and quality inspection before being transported to the site. During on-site installation, the spacing between fixing points should not exceed 300mm, and self-tapping screws should not be used to fix the glass panels. After installation, a concealed works inspection should be conducted before applying sealant. The sealant thickness should be greater than 3.5mm, and the width should not be less than twice the thickness. Sealant application (injection) should not be carried out at night or in rainy weather.

Send Inquiry